Merging the release-bump PR queues a develop upload run that wastes about 21 wheel jobs
PitfallVerified 30 Sep 2026Holds project: dftracer-utils
Pitfall. The symptom, what causes it, and the fix that was run and seen to work.
Symptom#
After the release-bump PR merges into develop, a develop-push "Upload Python Package" run starts. It would upload a .postN.dev0 prerelease for the same commit the release will build.
Cause#
If the release tag does not exist when the run's check job starts, the job builds about 21 wheel jobs for nothing.
Fix#
Cancel the run before you publish the release:
Evidence#
Observer note from a release session on 2026-09-30.
Also found by searching
- Upload Python Package run started after merging release bump PR, building .post1.dev0 wheels
- merging the version bump to develop kicks off a full wheel build that is wasted
- should I cancel the develop upload workflow before publishing the release
- gh run cancel develop push wheel jobs release tag not created yet
- after merging the release bump PR into develop a 'Upload Python Package' run started with 21 wheel jobs
- develop push triggers .post1.dev0 upload for the same commit I'm about to release
- gh run cancel <id> -R llnl-asr/dftracer-utils before gh release create